- Government of Montenegro
Administration for Capital Projects ADDENDUM 4, Lot I
Please note: The page below represents the archived content relating to the previous Government of Montenegro. Some of the information might be inaccurate or outdated.
Archive
ADDENDUM 4, Lot I
Published on: Mar 14, 2006 • 8:10 PM Author: Tenderi
Republic of Montenegro
Government of the Republic of Montenegro
Directorate for Public Works
Our reference: Podgorica, March 14, 2006
In accordance with Article 18 of the Public Procurement Law hereby
Addendum 4
(Lot I)
Is issued to Tender Documents No. 05-1/06 for construction and commissioning of High School of Medicine in Podgorica.
High School of Medicine in Podgorica
Book III (Bill of Quantity, Section Building Works and Construction Trades, A School Building without Gymnasium, Item 11 (Flooring and Floor Finishes) and Item 14 (Façade Works) originally specified:
- Item 11.004.
Floor finishes for classrooms, cabinets, library, practice rooms, reading rooms etc. by one of two possible options:
1. Thermoplastic polymer tiles (Tafic line or of a similar quality) or
2. First-class beech parquet as a higher quality option.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 2.417,48
Is herewith changed to be read:
- Item 11.004.
Floor finishes for classrooms, cabinets, library, practice rooms, reading rooms etc. will be the first-class beech parquet.
Delivery and placement of the first-class oak parquet by lying parquet tiles in adhesive over the previously constructed sub-floor. The parquet tiles to be laid by a fish-bone pattern, sanded and varnished in three coatings of colorless lacquer.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 2.417,48
- Item 11.006
Floor finishes for the access communication (porch and disabled access ramps) by two options:
1. First-class, external slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand; or
2. Stamped concrete paving with impressed patterns of natural stone, in al as for the technology following basic Manufacturers instructions.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 558
Is herewith changed to be read:
- Item 11.006
Floor finishes for the access communication (porch and disabled access ramps) will be the first-class, external slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 558
- Item 11.007
Floor finishes of the external fire escape stairs by one of two options:
1. First-class, external, slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand; or
First-class, external, slip-resistant stone tiles. Tile thickness is 25 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 85,2
Is herewith changed to be read:
- Item 11.007
Floor finishes of the external fire escape stairs will be of the first-class, external, slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 85,2
- Item 14.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall fastened by PVC support (pin hairs), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 5 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 603,40
Is herewith changed to be read:
- Item 14.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall supported by PVC support (umbrella shaped), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 603,40
- Item 14.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 1998,02
Is herewith changed to be read:
- Item 14.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 1998,02
- Item 14.003
Façade elements finish (fire escape stairs, main entrance portal, fascia on the porch eaves and disabled access ramps and terrace socle under pergola will be executed pursuant to one of the two proposed options by following manner:
1. Previously cleaned areas of the façade elements should be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 693,60
Is herewith changed to be read:
- Item 14.003
Façade elements finish (fire escape stairs, main entrance portal, fascia on the porch eaves and disabled access ramps and terrace socle under pergola will be executed pursuant in the following way:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 693,60
Book III (Bill of Quantity, Section Building Works and Construction Trades, B Gymnasium, Item 10 (Flooring and Floor Finishes) and Item 13 (Façade Works) originally specified:
- Item 10.003
Floor finishes for cabinets and equipment store room by one of two possible options:
1. Thermoplastic polymer tiles (Tafic line or of a similar quality) or
2. First-class beech parquet as a higher quality option.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 128,00
Is herewith changed to be read:
Item 10.003
Floor finishes for cabinets and equipment store room will be of thermoplastic polymer tiles (Tafic line or of a similar quality)
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 128,00
- Item 10.004
Parquet flooring installation in the gymnasium will be of prime quality beech parquet with finishes in all as for the Manufacturers recommendations, in agreement with the Designer and following Design Documents details, above all appendix referring to the structure joining.
The flooring should be done by means of the most common installation technology used for this type of buildings.
m1 586,67
Item 10.004 is herewith deleted and shall not be calculated through this Item of Works.
- Item 13.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall fastened by PVC support (pin hairs), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 5 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 198,05
Is herewith changed to be read:
- Item 13.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall supported by PVC support (umbrella shaped), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 198,05
- Item 13.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 620,80
Is herewith changed to be read:
- Item 13.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 620,80
Faithfully,
Zarko Zivkovic, CE
D I R E C T O R
Government of the Republic of Montenegro
Directorate for Public Works
Our reference: Podgorica, March 14, 2006
In accordance with Article 18 of the Public Procurement Law hereby
Addendum 4
(Lot I)
Is issued to Tender Documents No. 05-1/06 for construction and commissioning of High School of Medicine in Podgorica.
High School of Medicine in Podgorica
Book III (Bill of Quantity, Section Building Works and Construction Trades, A School Building without Gymnasium, Item 11 (Flooring and Floor Finishes) and Item 14 (Façade Works) originally specified:
- Item 11.004.
Floor finishes for classrooms, cabinets, library, practice rooms, reading rooms etc. by one of two possible options:
1. Thermoplastic polymer tiles (Tafic line or of a similar quality) or
2. First-class beech parquet as a higher quality option.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 2.417,48
Is herewith changed to be read:
- Item 11.004.
Floor finishes for classrooms, cabinets, library, practice rooms, reading rooms etc. will be the first-class beech parquet.
Delivery and placement of the first-class oak parquet by lying parquet tiles in adhesive over the previously constructed sub-floor. The parquet tiles to be laid by a fish-bone pattern, sanded and varnished in three coatings of colorless lacquer.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 2.417,48
- Item 11.006
Floor finishes for the access communication (porch and disabled access ramps) by two options:
1. First-class, external slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand; or
2. Stamped concrete paving with impressed patterns of natural stone, in al as for the technology following basic Manufacturers instructions.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 558
Is herewith changed to be read:
- Item 11.006
Floor finishes for the access communication (porch and disabled access ramps) will be the first-class, external slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 558
- Item 11.007
Floor finishes of the external fire escape stairs by one of two options:
1. First-class, external, slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand; or
First-class, external, slip-resistant stone tiles. Tile thickness is 25 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 85,2
Is herewith changed to be read:
- Item 11.007
Floor finishes of the external fire escape stairs will be of the first-class, external, slip-resistant ceramic tiles. Tile thickness is 10 mm. The tiles are laid in the cement mortar share proportion 1:3, made of fine-grained sand.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 85,2
- Item 14.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall fastened by PVC support (pin hairs), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 5 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 603,40
Is herewith changed to be read:
- Item 14.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall supported by PVC support (umbrella shaped), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 603,40
- Item 14.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 1998,02
Is herewith changed to be read:
- Item 14.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 1998,02
- Item 14.003
Façade elements finish (fire escape stairs, main entrance portal, fascia on the porch eaves and disabled access ramps and terrace socle under pergola will be executed pursuant to one of the two proposed options by following manner:
1. Previously cleaned areas of the façade elements should be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 693,60
Is herewith changed to be read:
- Item 14.003
Façade elements finish (fire escape stairs, main entrance portal, fascia on the porch eaves and disabled access ramps and terrace socle under pergola will be executed pursuant in the following way:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 693,60
Book III (Bill of Quantity, Section Building Works and Construction Trades, B Gymnasium, Item 10 (Flooring and Floor Finishes) and Item 13 (Façade Works) originally specified:
- Item 10.003
Floor finishes for cabinets and equipment store room by one of two possible options:
1. Thermoplastic polymer tiles (Tafic line or of a similar quality) or
2. First-class beech parquet as a higher quality option.
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 128,00
Is herewith changed to be read:
Item 10.003
Floor finishes for cabinets and equipment store room will be of thermoplastic polymer tiles (Tafic line or of a similar quality)
All works to be done in accordance with the Design detail. Selection among two possible options for floor finishes as well as decision on design and color will be made by the Promoter in agreement with the Designer.
Calculation per m2 of the floor area
m2 128,00
- Item 10.004
Parquet flooring installation in the gymnasium will be of prime quality beech parquet with finishes in all as for the Manufacturers recommendations, in agreement with the Designer and following Design Documents details, above all appendix referring to the structure joining.
The flooring should be done by means of the most common installation technology used for this type of buildings.
m1 586,67
Item 10.004 is herewith deleted and shall not be calculated through this Item of Works.
- Item 13.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall fastened by PVC support (pin hairs), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 5 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 198,05
Is herewith changed to be read:
- Item 13.001
Façade wall finishes will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality. The façade is constructed of the 5 cm thick expanded polystyrene panels by virtue of which is adhered to the wall supported by PVC support (umbrella shaped), all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade wall finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with smooth finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 198,05
- Item 13.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to one of two options by the following method:
1. Previously prepared façade areas shall be laid with the rough cast of the cement mortar, reinforced with metal fibers, while top finishes shall be of a natural river boulders from the local borrow pits. Boulder sizes should be of merely the same diameter, approximately 25 mm.
2. Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 620,80
Is herewith changed to be read:
- Item 13.002
Façade elements finishes (vertical pilasters and horizontal fascia) will be of the thermal façade system type IZOTERM, manufactured by "Prvi maj" Cacak or of a similar quality The façade is constructed of the 5 cm thick expanded polystyrene panels over which the final layers of the decorative plasters are spread prior to the PVC Rabitz mesh. Each expanded polystyrene panel along with adhering to the wall will also be fastened by PVC supports (pin hairs), in all as for the Manufacturers instructions. At the façade bottom, along total footprint of the building and in the full width of the expanded polystyrene the Z-perforated aluminum profile will be installed for the rodent protection. The building rounds as well as the entrance shall be reinforced with the façade decorative plasters of the PVC L-perforated profiles, size 30/30 mm.
Façade elements finishes will be executed pursuant to the following method:
Previously prepared façade areas shall be laid with the façade decorative plaster like bavalit, rofiks or of similar quality, of specified thickness, with rough finish, in color and tune by choice of the Designer.
Calculation per m2 of the fully executed item of finish inclusive of top finish, all additional frames and the necessary scaffold
m2 620,80
Faithfully,
Zarko Zivkovic, CE
D I R E C T O R