Jezerine – Lubnice road to open to traffic tomorrow

18. March 2024.
14:00h
Jezerine - Lubnice road
Published on: Mar 17, 2024 7:00 PM Author: Public Relations Service of the Government of Montenegro

Prime Minister Milojko Spajić, accompanied by Ministers Filip Radulović, Vladimir Martinović, and Director of the Transport Administration Radomir Vukasanović, will visit the Jezerine - Lubnice road and the "Klisura" tunnel, which will be opened to traffic tomorrow, 18 March.

According to the agenda, the Prime Minister will address the media with his associates at 2 p.m. Statements for the media will be made at the location provided in the link below: https://maps.app.goo.gl/oSUhbNbLboV1y462A?g_st=iw.

The trial operation regime implies that traffic will be enabled every day from 7 a.m. to 6 p.m., while the ban on traffic for freight vehicles and vehicles transporting dangerous materials will remain in effect until further notice.

The construction project of the "Klisura" tunnel and the reconstruction of the Lubnice - Jezerine road section (total length 14.44 km) is divided into four sections as follows:

  • Lubnice, involving the reconstruction of a 6.61 km road stretch, including the construction of an 80 m gallery.
  • Jelovica, involving the reconstruction of a 3.01 km road stretch.
  • Klisura, involving the reconstruction of a 3.87 km road stretch, including the construction of a 2,814 m tunnel and a 98 m bridge.
  • Jezerine, involving the reconstruction of a 0.95 km road stretch.

Following issues encountered during the construction of the Lubnice - Jezerine road section in the previous period, all construction and asphalt works on the open route and in the "Klisura" tunnel through Bjelasica have been completed.

Is this page useful?